Completed Projects |
|
| |
 |
DETAILED DESIGN
ENGINEERING SERVICES FOR EPCC OF J4 DEVELOPMENT PROJECT
| Client |
: |
Main Contractor: KENCANA
HL SDN BHD
Owner: PETRONAS CARIGALI SDN BHD |
| Total Manhour |
: |
39,443hrs |
| Project Location |
: |
Located at offshore Bintulu, Sarawak |
| Scope of work undertaken by MMC O&G |
: |
The scope of work will be to c onduct detailed design
for J4DP-A Development Project, host tie-ins, including
all modifications required at D35 COMPLEX . |
| Project Duration |
: |
4 months (May 07 to Sept 07) |
| Weight |
: |
N/A |
| |
|
|
|
 |
FRONT END ENGINEERING SERVICES FOR PC-4
GAS DEVELOPMENT PROJECT
MMC Oil & Gas Engineering Sdn Bhd was awarded the contract
to provide the Front End Engineering Design Services for Petronas
Carigali Sdn Bhd (CARIGALI). PC4 field is located approximately
148km offshore Bintulu at a water depth of 79 meters in block
SK310. The first gas is expected in Quarter four of the year
2007
| Client |
: |
PETRONAS CARIGALI SDN BHD (CARIGALI) / MMHE |
| Total Manhour |
: |
N/A |
| Project Location |
: |
Approximately 148km Offshore Bintulu |
| Scope of work undertaken by MMC O&G |
: |
Front End Design for 2 Single completion wells, Inter-platform
Pipeline (about 25km pipeline of size 12” to B11)
and Host Tie-in at B11. |
| Project Duration |
: |
Approximately 6 Months |
| Weight |
: |
N/A |
|
 |
PROVISION OF ENGINEERING, PROCUREMENT
& CONSTRUCTION (EPC) OF JACKET & TOPSIDES FOR BELUMUT-A
PLATFORM
NEWFIELD as Operator is developing Block PM323 offshore Peninsular
Malaysia. The block partners are NEWFIELD and CARIGALI, via
a 60:40 joint venture PSC agreement.
Two fields are identified within this block (i.e. East Belumut
and Chermingat). FEED engineering has been performed to obtain
the most optimized drilling/production facilities to tap the
reserves from these two fields. The development fields are located
at Peninsular Malaysia offshore block PM323 in approximately
65–75m of water. The East Belumut Field is located approximately
30km East of the existing Tinggi-A Platform. The platform shall
be designed to a 20-year design life. The schedule for first
oil from East Belumut field is on or before 01 January 2008.
East Belumut-A (BEL-A) is a drilling/process/accommodations
platform for handling production from up to 20 wells on the
platform itself plus incoming production from Chermingat (CHR-A)
located approximately 20 km to the northeast. BEL- A has a design
capacity for 50,000 bfpd plus compression facilities to handle
60 mmscfd. The platform will be a four-pile design with a skirt
pile support jacket structure. The jacket will support an integrated
deck with process, compression and utilities. The design includes
support for incoming and export pipeline risers, produced water
treatment and disposal, boat landings and a 30-man accommodations
module. The topside structure will be an integrated deck supporting
three deck levels, heli-deck, flare boom and a crane.
NEWFIELD MALAYSIA has invited several EPCC Contractors to develop
Belumut-A Jacket & Topsides. Ramunia Fabricators Sdn Bhd
has been awarded to develop the Belumut–A Platform and
they have invited MMC Oil & Gas Engineering Sdn Bhd as their
Detailed Design Consultant. MMC Oil & Gas will provide design
engineering services, project management, technical coordination,
secretarial, cost control services and provision of experienced
personnel to perform the required services.
| Client |
: |
RAMUNIA FABRICATORS SDN BHDNEWFIELD PENINSULA
MALAYSIA INC. (NEWFIELD MALAYSIA) |
| Total Manhour |
: |
N/A |
| Project Location |
: |
Block PM 323, located offshore Peninsular Malaysia,
300km off Terengganu |
| Scope of work undertaken by MMC O&G |
: |
Detailed Engineering Design |
| Project Duration |
: |
Approximately 4 months - Engineering Services |
| Weight |
: |
Topside: 2700mt
Jacket: 2000mt |
|
 |
PROVISION OF FEED DESIGN AND ENGINEERING
SERVICES FOR BINTULU ONSHORE RECEIVING FACILITIES (BORF)
The Bintulu Onshore Receiving Facilities (BORF) is designed
to receive, compress, dehydrate and chill saturated gas from
three offshore fields, Golok (Golok Barat and Golok Central),
Serampang and Merapuh. The gas contains relatively small amounts
of condensate and water at the facility inlet as the bulk of
the liquids have been removed offshore. The DCQ (Daily Contract
Quantity) for the BORF is 250 MMscfd, with an export MDQ (Maximum
Design Quantity) of 360 MMscfd.
At the inlet to BORF the process gas / liquids stream will be
separated in an Inlet Separator, The gas will be compressed
before being routed to the TEG dehydration system. The compression
section will consist of reciprocating machines. After the gas
has been dried and chilled, it is exported to MLNG where it
is metered via fiscal gas metering at the required maximum delivery
pressure of 72 barg at MLNG-3 tie-in point
The liquids from the Inlet Separator and the separated condensate
from Chilled Gas Separator are routed to a 3-phase LP Separator
where condensate and water are separated. The condensate is
sent to a degassing boot and then to the storage tank where
it is dewatered and exported by pipeline to offshore. The produced
water is sent to another storage tank and then to a water treatment
facility before it is disposed off to an outfall via ocean outfall.
| Client |
: |
MURPHY OIL CORPORATION |
| Total Manhour |
: |
36,000 hrs |
| Project Location |
: |
Located onshore Bintulu, Sarawak at approximately 2km
to the east of the existing MLNG-3 plant |
| Scope of work undertaken by MMC O&G |
: |
Front End Engineering Design for Bintulu Onshore Receiving
facilities from the Beach valves near MLNG-3 going into
BORFand finally to the sales gas tie-in at the Gas Metering
Station (GMS) at MLNG-3. The C&S activity was carried
out by a 3rd party local consultant. |
| Project Duration |
: |
Award date 5 July 2006 & Completion 27 October 2006Total
project duration is originally planned at 16 weeks |
| Weight |
: |
Not applicable for onshore project |
|
 |
Front End Engineering Design (FEED)
for Bumi, Bulan and Suriya
MMC Oil & Gas Engineering Sdn Bhd was awarded the contract
to mainly involve in FEED study for Bumi, Bulan and Suriya
Gas Field which is located in Block A-18, approximately 150
kms NE of Kota Bharu, Kelantan and 100km south of the Bongkot
Field in approximately 55m-60m of water depth in Malaysia
–Thailand Joint Development Area (MTJDA).
Client : Carigali Triton Operating Company (CTOC)
Period : months
Total Manhours : 17,275
Weight : N/A |
 |
Engineering
Design Sevices for Angsi Phase IV- Angsi-D Satellite Drilling
Platform (AnDP-D), Associated Pipelines and AnDP-D Host Tie-in
at Angsi-A Complex (Base)
| Client |
: |
PETRONAS CARIGALI SDN BHD |
| Total Manhour |
: |
85,000 |
| Project Location |
: |
Located at offshore Terengganu, Peninsular Malaysia |
| Scope of work undertaken by MMC O&G |
: |
The scope of work will be Conceptual and Detailed Design
for Angsi-D Satellite Drilling Platform (AnDP-D), Associated
Pipelines and AnDP-D Host Tie-in at Angsi-A Complex. |
| Project Duration |
: |
5 months (July 06 to December 06) |
| Weight |
: |
Topsides – 1500 MT, Jacket – 2300MT |
|
 |
PROVISION
OF ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) OF JACKET
& TOPSIDES FOR CHERMINGAT PLATFORM
| Client |
: |
OIL FAB SDN BHDNEWFIELD PENINSULA MALAYSIA
INC. (NEWFIELD MALAYSIA) |
| Total Manhour |
: |
20,000 |
| Project Location |
: |
Block PM 323, located offshore Peninsular Malaysia,
300km off Terengganu |
| Scope of work undertaken by MMC O&G |
: |
Detailed Engineering Design |
| Project Duration |
: |
Approximately 4 months - Engineering Services |
| Weight |
: |
Topside: 400mt
Jacket: 500mt |
|
 |
Provision of Front End Engineering Services
(FEED) for Newfield Block
PM 323 Development Project
MMC Oil & Gas Engineering Sdn Bhd was awarded the
contract to provide the design engineering Services for Newfield
Peninsular Malaysia, which is located at Peninsular Malaysia
offshore block PM 323 in approximately 65-75m of water oil reserves
of approximately 33 million bbls, expected.
Client : Newfield Peninsular Malaysia Inc
Period : 3 months
Weight : N/A |
 |
CONCEPTUAL
DESIGN & ENGINEERING SERVICES FOR KUMANG CLUSTER DEVELOMENT
PROJECT
| Client |
: |
PETRONAS CARIGALI SDN BHD |
| Total Manhour |
: |
29,000hrs |
| Project Location |
: |
Kumang Cluster fields consists of F9KG-A CPP, F9JT-A
wellhead, Kumang (KUJT-A) wellhead and Kanowit (KAJT-A)
wellhead. The Kumang field is located approximately 200km
from the MLNG plant offshore Bintulu, Sarawak. The water
depth is ranges between 60m to 100m. |
| Scope of work undertaken by MMC O&G |
: |
The Kumang Cluster field development (FDP) consists
of 2 phases. Phase 1 FDP consist of F9, Kumang and Kanowit
fields; while Phase 2 FDP consist of A3, F11, F22, F27,
F12, Selar Marine and Bunga Pelaga fields. The project
scope covers only the Phase 1 development, and includes
the intrapipelines to MLNG-2/3 |
| Project Duration |
: |
Award date 24 July 2006 & Completion 13 October
2006Project Integrated Review (9 weeks after award)Final
Design Package (12 weeks after award) |
| |
|
 |
FEED
SERVICES FOR J4 & D21 FIELD DEVELOPMENT
| Client |
: |
PETRONAS CARIGALI |
| Total Manhour |
: |
33,000 hrs |
| Project Location |
: |
Offshore Bintulu Sarawak |
| Scope of work undertaken by MMC O&G |
: |
1) Concept Selection Study.
i) Steady State Flow Assurance Study
ii) Field Development Concept Evaluation Study
2) FEED for J4DP-A & D21DP-A platforms and host tie
in to the existing D35 Complex |
| Project Duration |
: |
22 weeks |
| Weight |
: |
J4 Jacket ~ 878 MT (factored)
J4 Topside ~ 900 MT (factored)
D21Jacket ~ 878 MT (factored)
D21 Topside ~ 900 MT (factored) |
|
 |
FEED
SERVICES FOR PM323 DEVELOPMENT PROJECT
| Client |
: |
NEWFIELD PENINSULA MALAYSIA INC. |
| Total Manhour |
: |
20,000 hrs |
| Project Location |
: |
Offshore Terengganu |
| Scope of work undertaken by MMC O&G |
: |
1) Conceptual Study
2) Front End Engineering Design
| |
| Stage 1: |
· |
To identify the best potential options
for the field development and to generate a shortlist
of feasible options, of which one will be carried
forward to Stage 2 after development options evaluation.
The key activities are Kick-off meeting and options
brainstorming meeting for each platform facilities
|
| |
|
Stage 2:
The key activities of Stage 2 are as follows: |
· |
|
· |
|
· |
Review / confirm validity of option selection
in Stage 1 |
· |
Identify operations and Maintenance philosophy |
· |
Develop Basic Design Engineering documents for
all disciplines ready for EPCC bidding for both
platforms. |
· |
Develop EPCC scope of work for Detail design,
fabrication, commissioning and Offshore Installation
contractor. |
· |
Develop cost estimate for the selected development
scenario |
|
| Project Duration |
: |
5 months |
| Weight |
: |
East Belumut-A :
Jacket ~ 2000 MT
Topside ~ 2700 MT
Chermingat-A :
Jacket ~ 500 MT
Topside ~ 400 MT |
|
 |
CONCEPTUAL
AND BASIC ENGINEERING SERVICES FOR PEARL DEVELOPMENT PROJECT
| Client |
: |
PETRONAS CARIGALI VIETNAM LIMITED |
| Total Manhour |
: |
31,000 hrs |
| Project Location |
: |
PC VIETNAM LIMITED is undertaking the development of
Pearl field which is located approximately 8km east of
Ruby Field and 160km offshore Vung Tau, SR Vietnam in
Blocks 01 and 02, in water depth of about 49m. |
| Scope of work undertaken by MMC O&G |
: |
Activities include:MMC O&G scopes
of work are in 2 stages, namely:
Stage I : Conceptual Engineering
Stage II : Basic Engineering (including preparation
of EPCIC packages) |
| Stage I : Conceptual engineering scope
of work includes the following: |
| i) |
Process study for Pearl field, options
for interconnecting pipelines and Host Tie-in development;
|
| ii) |
Manning level, control and telecommunication study
and, |
| iii) |
Feasibility study and selection for LWS, required
facilities and Equipment layout and platform configuration. |
| |
|
| Stage II : Basic Engineering scope
of work includes the following: |
| (i) |
Define and finalise the size and selected development
option(s) from Stage I and |
| (ii) |
Basic design work for Stage II will be categorised
as follows : |
· |
Design Parameters and Environmental Data |
· |
Process and Safety Engineering |
· |
Mechanical Engineering |
· |
Instrumentation Control, Shutdown and Telecommunication
Engineering |
· |
Electrical Engineering |
· |
Structural Engineering |
· |
Pipeline Engineering |
|
| Project Duration |
: |
| Stage I: |
Conceptual Engineering (04/04/06 –
26/05/06) = 19 WEEKS |
| Stage II: |
Basic Engineering (18/08/06 – 10/11/06)
= 57 WEEKS |
| |
|
|
| Weight |
: |
N/A |
|
|
Conceptual and FEED study for debottlenecking of the Kharg and Lavan Island processing facilities
MMC Oil & Gas Engineering Sdn. Bhd. has been working together with Pegasus Oil & Gas Consultant Sdn Bhd as a subcontractor to provide the conceptual and FEED study for debottlenecking of the Kharg and Lavan Island processing facilities namely Foroozon, Aboozar, Dorood-1 and Dorood-2 processing plants which are located in Iran.
Client : Pegasus Oil & Gas Consultant Sdn Bhd
Period : months
Total Manhours : 25,000
Weight : N/A |
|
Provision For Detailed Design of BK-C
Annex Jacket
MMC Oil & Gas Engineering Sdn Bhd was awarded the contract
to
provide detail design engineering for Malaysia BK-C Annex Jacket
project by Talisman Malaysia Limited. The design will be based
on a
conceptual design by ICON Engineering Pty Ltd. The proposed
BKC
Annex is located in South China Sea in Block PM-3 Development
Approximately 250km off east coast of Peninsular Malaysia with
water
Depth of 54m
Client : Talisman Malaysia Limited
Period : 6 months
Weight : N/A
|
|
Provision For Detailed Design of BK-C
Annex Topside
MMC Oil & Gas Engineering Sdn Bhd was awarded the contract
to
provide detail design engineering for Malaysia BK-C Annex Topside
project by Talisman Malaysia Limited. The design will be based
on a
conceptual design by ICON Engineering Pty Ltd. The proposed
BKC
Annex is located in South China Sea in Block PM-3 Development
Approximately 250km off east coast of Peninsular Malaysia with
water
Depth of 54m
Client : Talisman Malaysia Limited
Period : 4 months
Weight : N/A
|
 |
Detailed Design Services for Miri Crude Oil Terminal (MCOT) Rejuvenation Project Phase 2
MMC Oil & Gas Engineering Sdn Bhd was awarded the contract to provide the detailed design engineering services to Petronas Carigali Sdn Bhd (PCSB).
Client : Petronas Carigali Sdn Bhd (PCSB)
Period : 11 months
Total Manhours : 77,000
Weight : N/A |
|
DETAIL DESIGN AND ENGINEERING OF ELECTRICAL & INSTRUMENTATION FOR E & I BUILDING OF THE ERHA FPSO PROJECT
| Client |
: |
MALAYSIAN SHIPYARD ENGINEERING SDN BHD |
| Total Manhour |
: |
Total = 20,000 hrs |
| Project Location |
: |
The Erha Field located in block OPL 209, approximately 90km from nearest coast of Nigeria . The water depth in ERHA Field ranges from 920m in the East to 1271m in the South East |
| Scope of work undertaken by MMC O&G |
: |
Detailed Structural Engineering and Design Contract for the nine (9) Electrical and Instrument (E&I) Building of ERHA FPSO (Floating, Production, Storage and Offshore Vessel) |
| Project Duration |
: |
Award date April 2003; Completed date Oct 03 |
Weight |
: |
E&I BUILDING A: 3,939 MT
E&I BUILDING B: 1,983 MT
E&I BUILDING E: 1,427 MT
E&I BUILDING F: 2,148 MT
E&I BUILDING G: 1,312MT
E&I BUILDING K: 1,698 MT
E&I BUILDING M: 3,778 MT
E&I BUILDING P: 4,008 MT
E&I BUILDING Q: 1,458 MT |
| Technical Description |
: |
MMC O&G was awarded by Malaysia Shipyard Engineering Sdn Bhd to come out with a Detailed Design for nine Electrical and Instrument (E&I) Building of the ERHA FPSO. The activities done by MMC O&G are:
To Design a Detailed Layout drawings and equipment/piping/E&I loading of Module
Load out computer SACS model
The primary purpose of the electrical building is to house the facility electrical power distribution equipment, general control panel, DC & UPS system, Navigational aid power supply & control equipment, various production skid control panel and platform process & safety equipment.
The building shall include the following system:
Heating, Ventilation and Air conditioning (HVAC) system
Building Pressurization System
Building Electrical System (lighting, earting & socket etc)
Fire Protection System, Public Address and Alarm System
Piping and Plumbing System
The project consists of sub-sea wells tied back to an FPSO in 3400 feet of water. The development are expected to recover about 500 million barrels and the first oil projected in 2005 |
|
|
 |
B12 CONCEPTUAL AND DETAILED DESIGN MMC O&G S/B was awarded the Conceptual & Detail Engineering of B12 project in July 2004. Located approx 9km due East of the existing B11 gas field Period: 9/2004 - 12/2006 Total Manhours: 28,000 Weight: N/A tie-in to B11 DR |
 |
RUBY-A (RBDP-A) GASLIFT PROJECT MMC Oil & Gas Engineering Sdn Bhd was awarded the contract to provide engineering support by PTSC (Vietnam) as part of the latter’s fabrication work of Ruby-B (RBDP-B) Topsides for Petronas Carigali Vietnam (PCV). Period: 1/2004 - 6/2005 Total Manhours: Ruby A : 14,000 Ruby B:15,000 Weight: |
 |
DETAILED DESIGN FOR NF-A (PS-4) TOPSIDES
UPGRADE FOR QATAR PETROLEUM
MMC Oil & Gas Engineering Sdn Bhd was awarded with the detailed engineering design work for the PS4 Topsides Upgrade Project which is being developed by Qatar Petroleum to upgrade the gas production and handling capacity of the PS4 platform located in the North Field offshore Qatar. Period: 7/2004 - 4/2005 Total Manhours: 15,000 Weight: n/a |
 |
DETAILED DESIGN & ENGINEERING SERVICES FOR BARAM SOUTH DEVELOPMENT PROJECT The project was awarded by Petronas Carigali Sdn Bhd (PCSB)in July 2003 for the Detailed Design services of three (3) platforms which is located approximately 25 km offshore Lutong, Sarawak.It comprises Compression & Production Platform (BAKP-B), Wellhead Platform (BAJT-H) and Wellhead Platform (BAJT-I), as well as the associated Pipelines tie-ins to the existing BAK-B and BAP-B platforms. Period: 7/2003 - 10/2004 Total Manhours: 90,000 Weight: BAJT-H & BAJT-I 2100 MT , BAKP-B 5900 MT |
 |
FEED FOR RESALAT (R1) OFFSHORE COMPLEX RENOVATION AND RECONSTRUCTION PROJECT MMC Oil & Gas Engineering has pursued potential market in Iran and collaborated with Pegasus Oil & Gas Engineering to undertake the engineering and project management services which includes Front End Engineering Design (FEED) study for the Design of new topsides and substructure for Resalat (R1) Offshore Complex. Period: 12/2003 - 6/2004 Total Manhours: 55,000 Weight: 30,000 MT |
 |
Detailed Design OF B11P-A Platform (Jan. 2002 - July 2002) B11 field is the 4th gas field to be developed by Sarawak Shell Berhad (SSB) in the Central Luconia geological province to supply gas for the MLNG-DUA project in Bintulu. It lies approximately 170km to the north of Bintulu. Period: 1/2002 - 7/2002 Total Manhours: 85,000 Weight: 7,600MT |
 |
Detailed Engineering Design For Kinarut Development Project
(Dec 2001 - July 2002) The project was on a fast track schedule and the detailed engineering part to be completed within four (4) months duration in order to meet the expected first gas date in the first quarter, 2004.Kinarut field is located in Block SB 301 offshore Sabah, approximately 37 km Northwest of the existing Erb West field, and about 100km Northwest of Kota Kinabalu. Period: 12/2001 - 7/2002 Total Manhours: 54,000 Weight: 8,400MT |
 |
Detailed Design of Irong Barat A Compression (Jan 2001- Sept 2001) The project by Esso Production Malaysia Inc. (EPMI) now known as EXXON-MOBIL Exploration and Production ( M) Inc involved major modifications to the existing IBA facilities was completed in eight months, from February 2001 to September 2001. Period: 2/2001 - 9/2001 Total Manhours: 74,000 Weight: N/A |
 |
Detailed Design of Larut A Jacket and Pipeline (1998 - 1999) The detailed design of Larut A jacket for EPMI (now known as EXXON MOBIL Exploration and Production (M) Inc) was completed in 16 months, from May 1998 to September 1999. The major project milestone includes Phase 1 design review, Phase 2 design review, IFB, IFB Addendum and IFC. A total of 60 drawings were issued at IFC. Period: 5/1998 - 9/1999 Total Manhours: 5,000 Weight: Jacket : 3,500MT |
 |
Flexsys Cap2 Project For Flexsys Chemical/Stone & Webster Services Sdn Bhd (1998 - 2000) The detailed design of the Outside Battery Limit Non-Process (OSBL-NP) facilities and the support of the Inside Battery Limit (ISBL) facilities as part of the design and construction of Flexsys CAP2 sulphur plant in Gebeng, Kuantan for Stone and Webster, started in October 1998 completed in September 1999. Period: 10/1998 - 9/1999 Total Manhours: 50,000 Weight: N/A |
 |
Helang Field Development (1996 - 1999) The projects involve the detailed engineering of the facilities that started in December 1996 and completed in October 1998, and the detailed engineering and procurement assistance of major equipment packages to be procured by Nippon Oil Exploration which started in 1997. Period: 12/1996 - 10/1998 Total Manhours: 80,000 Weight: Topside : 9,000MT |
 |
Preliminary Design And Detailed Design Of Raya A Integrated Deck, Pipeline,
Jacket And Associated Facilities (1995 - 1997) This project for Esso includes the detailed design of an integrated topside unmanned facility, sixteen-inch, 26 km three-phase pipelines from Raya-A and Seligi-A as host platform and the eight-inch, 26km gaslift pipelines from Seligi-A to Raya-A and also the jacket structure, foundation and its appurtenances, was completed in 15 months, from April 1995 to July 1997. Period: 4/1995 - 7/1997 Total Manhours: 54,000 Weight: Topside : 1,220MT Jacket : 1,610MT |
 |
RBDP A Detailed Engineering Design The 5 months detailed design and procurement assistance of Drilling/Riser Platform (RDP-A) is part of the Resak gas field development for Petronas Carigali Sdn. Bhd. A total of 22,000 man-hours were utlilized for the design involved usage of 3D modeling (PDMS and BOCAD). Period: 10/1996 - 3/1997 Total Manhours: 22,000 Weight: Jacket : 1,700MT Topside : 1,800MT |
 |
Detailed Design of Lawit ‘A' Compression Modules (1995 -1997) This project was undertaken by MMC O & G as a roll over to Lawit A Complex Detailed Design . It entailed
the detailed designing of 2 compression modules designated as Module 1 (M1) and Module 2(M2) which are both located on the South of Lawit 'A' Production Platform. Period: 4/1995 - 11/1996 Total Manhours: 38,000 Weight: Compression Module: 1,700MT |
 |
Detailed Design of Lawit A Gas Complex (1993 - 1995) MMC Oil & Gas Engineering had provided the preliminary design assessment to confirm the conceptual design parameters, detailed designs, procurement assistance and construction support for the topside facilities for the Lawit 'A' Gas Complex for EPMI. The work was completed in eighteen months, starting from July 1993 and ending in February 1995. Period: 7/1993 - 2/1995 Total Manhours: 160,000 Weight: Topside : 12,300 |
|
| |
 |
|
|