Completed Project : Engineering Design Sevices for Angsi Phase IV- Angsi-D Satellite Drilling Platform (AnDP-D), Associated Pipelines and AnDP-D Host Tie-in at Angsi-A Complex (Base) |
|
Angsi field is located approximately 165 km off the East coast of Peninsular Malaysia in a water depth of 69 m mean sea level (MSL). The Angsi-A Complex, comprising of a central processing platform, a drilling / riser platform and a 100-m long interconnecting bridge will be the host and processing platform for AnDP-B, AnDP-C, AnDP-E, AnDP-D, future nearby platforms such as Besar as well as a southern hub for gas from PM-9 and future southern gas fields. Dehydrated compressed gas from Guntong-D (GuD) and Seligi-A (SeA) flow across AnDR-A to the Onshore Slug Catcher (OSC). Dehydrated compressed gas from AnDR-A is evacuated via pipeline to OSC. Combined crude and condensate are exported to TCOT via the Tapis Pump crude pipeline system.
Petronas Carigali Sdn. Bhd. (PCSB) and Exxon-Mobil Exploration & Production Malaysia Inc (EMEPMI) are the joint venture partners on the Angsi project under the main terms and conditions of the gas production sharing contract (GPSC).
The new Angsi-D satellite-drilling platform (AnDP-D) Host Tie-in at Angsi-A complex. This complex consists of Angsi-A Central Processing Platform (AnPG-A) and Angsi Drilling And Riser Platform (AnDR-A).
Production crude from AnDP-D will be free flowed to Angsi-A Complex via a dedicated crude oil pipeline. New host tie-in facilities in order to receive crude from AnDP-D are required at Angsi-A complex.
All the relevant host tie-in works are plan to be carried out to meet the first oil target from Angsi-D in Q4, 2007.
| Activities include: |
| i) |
Design unmanned and remotely operated satellite platform to AnPG-A with a new 4-legged structure with conductors (drive pipes) installed in each of 16 slots. |
| ii) |
Prepare all AFB engineering documents and drawings for Angsi-D and associated tie-ins to Angsi-A, for EPCIC bidding. |
| iii) |
Prepare AFC documents and drawings for Angsi-D and associated tie-ins to Angsi-A for fabrication purposes. |
| iv) |
Prepare cost estimates for EPCIC. |
| v) |
Compile engineering final documentation. |
| |
|
| Client |
: |
PETRONAS CARIGALI SDN BHD |
| Total Manhour |
: |
85,000 |
| Project Location |
: |
Located at offshore Terengganu, Peninsular Malaysia |
| Scope of work undertaken by MMC O&G |
: |
The scope of work will be Conceptual and Detailed Design for Angsi-D Satellite Drilling Platform (AnDP-D), Associated Pipelines and AnDP-D Host Tie-in at Angsi-A Complex. |
| Project Duration |
: |
5 months (July 06 to December 06) |
| Weight |
: |
Topsides – 1500 MT, Jacket – 2300MT |
|
|
 |
|
|