which is located approximately 148km offshore Bintulu
at a water depth of 79 meters in block SK310. The first
gas is expected in Q3 2008. Two (2) wells will be drilled,
each is expected to produce up to 200 mmscfd. Gas production
at plateau of 220 mmscfd is anticipated from PC4 field.
Gas production from PC4 will be tied back to B11 hub
via a 12” pipeline for a distance of 25km. The
gas will be metered prior to going into B11 processing
facilities. B11 is jointly owned by (Sarawak Shell Berhad)
SSB and PCSB with 50:50 ownership and operated by SSB.
PC4 field will be developed on a fast-track basis with
the following facilities:
i) Unmanned minimum facilities platform with 2 single
completion wells
ii) Inter-platform Pipeline (about 25 km pipeline of
size 12” to B11)
iii) Host Tie-In activities at B11, E11 and BOCC