Design & Procurement Support for CKP Mercury Removal Unit

The main scope of this contract includes Engineering Design and Procurement Services for the following tasks:

• Optimum Location of Mercury Removal Units
• Tie-in drawings
• Equipment Lists
• Datasheets
• Bulk estimates (piping, Electrical, Instrumentation, Structures)
• Weight Estimate and Jacket Capacity Analysis
• HAZOP/Safety Studies
• Package Equipment Technical Specifications
• Material Take-offs
• PDMS Modelling
• Construction and Installation drawings
• Technical Bid Package preparation and evaluation assistance
• Package post-award engineering interface management assistance
• Required office facilities
MMCOG shall also provide procurement support covering Technical Bid Evaluation and post package award interface engineering.

Client :

Design & Procurement Support for CKP Mercury Removal Unit

Total Manhour : Base Scope – 31,612
Optional Scope – 4,452
Project Location : The Cakerawala field is located in Block A-18, approximately 150 km NE of Kota Bharu and approximately 100 km south of the Bongkot field in approximately 55 m of water in the Malaysia-Thailand Joint Development area
Project Duration : 5 Months (October 24th 2007 – March 21st 2008)
Weight : N/A
Technical Description : The well production streams are now beginning to show signs of mercury breakthrough. Further mercury build up may result in breach of the sales gas specification limit for mercury. In addition the mercury may also end up in the condensate and produced water streams. As a result CARIGALI HESS is desirous of carrying out Front End Engineering (FEED) and Detail Design (DD) of facilities for Mercury Removal in the gas, fuel gas, condensate and water streams.

The FEED work shall include development of Mercury Removal Unit (MRU) package technical specifications (for bidding), engineering calculation sizing or reports, studies to suitably locate the unit within the existing platform, and lift or installation studies.

The detail engineering design phase shall include engineering design drawings, material take-off’s, PDMS modelling and material purchase requisition specifications internal and external to the MRU skid package