Thursday, August 28, 2008 ::  

  Corporate Profile
  Services
  Experiences
  Business Clients
  Locations
  Links
  Technical Paper
  Press Release
  Feedback
New Secured Projects
Conceptual Design & Detailed Design Of F6 Tie-In For F28 Development Project

The scope of work includes the conceptual and detailed design for the modification of the topsides facilities at the existing F6K-A and F6DP-A for the tie-ins of F28DR-A, which form the F28 Gas Field Development Project.

This shall include but not limited to the design for:
1) 1 x Riser
2) 4 x J-tubes
2) Pig receiver
3) Inlet separator
4) Metering facilites
5) Water treatment facilities
6) Corrosion and hydrates inhibitor skids
7) Tie-ins to existing F6 processing and compression facilities

Client : SARAWAK SHELL BHD
Total Manhour : Conceptual Design: 26,881
Detailed Design: 35,097

Total Based Scope: 61,978
Total Provisional Scope: 15,274

Project Location : Miri, Sarawak
Project Duration : 10 months, Conceptual 4 Months, Detailed 6 Months
Weight : N/A
Technical Description : (1) Part 1 - Mobilisation and Review of Documentation
This part requires the CONTRACTOR to have in place an adequately manned project office to undertake the requirements of the F28 Development Project. The CONTRACTOR is required to review and be familiar with the contents of the F28 Gas Field Development (F28DR-A) Basis For Design (Ref: EPA-T-EP07-R07), design CTRs, other relevant documentation and with the existing F6 processing and compression facilities. Any discrepancies or clarification shall be itemised and discussed with the COMPANY at clarification meetings arranged by the COMPANY, after which the CONTRACTOR is deemed to have agreed with the accuracy and completeness of those documentation.

(2) Part 2 - CONTRACTOR Services
This part covers the general services required to support the design and engineering activities under Part 3 and Part 4 herein. It shall include but not limited to the following:
1. Project management – including project information and admistration system
2. Project planning and progress reporting
3. Cost estimating and control
4. Quality management
5. Document control
6. Computing, reproduction and etc - relevant supporting infrastructure
7. Travel, site visits, interface meetings, and etc - relevant supporting activities

(3) Part 3 – Conceptual Design to “AFD” Status
This part covers the discipline engineering efforts required for Conceptual Design scope of work to Approved for Design (AFD) status . The Conceptual Design shall be completed in four months after award of design contract.

(4) Part 4 – Detailed Design to “AFC” Status
This part covers the discipline engineering efforts required for Detailed Design scope of work to Approved For Construction (AFC) status. Detailed Design shall be completed in six months after completion of Conceptual Design.
Part 4: Scope Of Work
Tender No. 600187 - Conceptual Design & Detailed Design of F6 Tie-in and Pipeline for F28 Development Project.
Prior to reaching AFC status, there will be an intermediate step to issue a Detailed Design package at Approved for Bid (AFB) status to facilitate the tendering for the fabrication contract.

(5) Part 5 – Project Follow-up
The CONTRACTOR will be required to make available suitable staff to work with the COMPANY’s Project Team throughout the fabrication, offshore installation, hook-up and commissioning phases to satisfactory start-up and production.

(6) Part 6 – Materials Technical Requisition Services
This part covers the preparation of material technical requisition packages for the project.