MMC Oil & Gas Engineering Sdn Bhd are responsible for the Conceptual and Detailed Design of Bekok-D Satellite Platform.

Period: 9/2004 - 6/2005
Total Manhours: 30,000
Weight: Topside 708 MT

Bekok Field is located approximately 260 km off the East Coast Peninsular Malaysia. MMC Oil & Gas Engineering Sdn Bhd are responsible for the Conceptual and Detailed Design of Bekok-D Satellite Platform. The Satellite drilling platform will be installed with minimal facilities by upgrading the Bekok-A facilities to receive the additional Full Well Stream (FWS) hydrocarbon.

• Tripod satellite drilling platform
• Water depth of about 70m
• 800 MT topside with three-legged tripod
• 12 straight conductor slots
• Designed for 25 years life.
• Project duration of 6 months
• Completed with 30,000 man hours.