Friday, December 19, 2014      Login     Contact Us
 

News & Events

  • Health Talk: "Silent Killers"

    In conjunction with the government's awareness raising campaign on "Silent Killers", MMCOG has held a Health Forum with Ms Priscilla Peter from Advanced Healthscreen Management
    2014-12-18 17:50
  • Majlis Bacaan Yassin & Doa Selamat Sempena Tahun Baru 2015

    MMCOG telah menjayakan Majlis Bacaan Yassin beserta Doa Selamat sempena menyambut kedatangan tahun 2015 pada 11 Disember 2014, bersamaan 18 Safar 1435H.
    2014-12-15 15:26
  • MMCOG's MINDA project appears as one of three finalists for Be Inspired Awards

    MMC Oil & Gas Engineering Sdn Bhd (MMCOG) was selected as one of three finalists for the MINDA project in the Project Performance category for the Be Inspired Awards competition.
    2014-12-15 10:06
  • MMCOG won 2 awards at the MSC SSO Night of Excellence

    MSC held their Shared Services & Outsourcing Night of Excellence Award 2014 on the 10th of December 2014. More than dozens of companies' representatives were invited as commemorative of their MSC statuses.
    2014-12-11 10:54
  • MMC Games 2014

    MMC Oil & Gas Engineering, alongside our sister companies - were the competitors at our first infra-organizational MMC Games tournament 2014.
    2014-11-20 17:30

Our services


Last Updated: Thursday, December 18, 2014 - 17:50

Detailed Design & Engineering Services For Baram South Development project

The project was awarded by Petronas Carigali Sdn Bhd (PCSB)in July 2003 for the Detailed Design services of three (3) platforms which is located approximately 25 km offshore Lutong, Sarawak.It comprises Compression & Production Platform (BAKP-B), Wellhead Platform (BAJT-H) and Wellhead Platform (BAJT-I), as well as the associated Pipelines tie-ins to the existing BAK-B and BAP-B platforms.

Period: 7/2003 - 10/2004
Total Manhours: 90,000
Weight: BAJT-H & BAJT-I 2100 MT , BAKP-B 5900 MT

The project was awarded by Petronas Carigali Sdn Bhd (PCSB) to MMC Oil & Gas Engineering Sdn Bhd in July 2003 for the Detailed Design services of three (3) platforms which is located approximately 25 km offshore Lutong, Sarawak. It comprises Compression & Production Platform (BAKP-B), Wellhead Platform (BAJT-H) and Wellhead Platform (BAJT-I), as well as the associated Pipelines tie-ins to the existing BAK-B and BAP-B platforms. BAJT-I is linked to BAJT-H via 10" multiphase pipeline/6" gaslift pipeline. While, BAJT-H is linked to BAKP-B via another separate multiphase/ gaslift pipeline for processing facilities at BAKP-B. A temporary 16-man shelter is located at BAKP-B. Detailed Design was completed in May'04, with AFC drawings finalized in October'04.

Facilities Description

• Water Depth ranges from 12m to 61m
• New BAKP-B bridge-linked to existing BAK-B
• 6-legged structure for BAKP-B, 4-legged structure for BAJT-H & BAJT-I
• Designed to produce 160 MMscfd of export gas and 55 MMscfd lift gas
• Designed for 25,000 bpd crude oil production
• Designed to SIPROD mode of operation and catering to jackup & rigup conditions.
• Design Life to 25 years
• Platform is expected to be in operation by 4th Quarter 2005.