Saturday, November 01, 2014      Login     Contact Us
 

News & Events

  • MMC O&G targets to double revenue by 2018

    MMCOG as appeared on The Malaysian Reserve local business coverage in conjunction with MOGSEC 2014 event. Excerpted: "...MMC Oil & Gas Engineering to plan strategic mergers and acquisitions to add revenue and diversify business segments in the mix."
    2014-10-01 11:17
  • MOGSEC 2014

    MMCOG at the MOGSEC 2014 - a showcase of the latest technology, equipment and machinery in the fields of Oil, Gas and Petrochemical Engineering by Malaysian Oil & Gas service providers.
    2014-09-30 17:57
  • MMC Aidil Fitri Open House 2014

    As per annual tradition, MMCOG had also been invited to enliven the MMC Group Hari Raya Open House which was held on the 7th of August 2014 (11 Syawal 1435H) from 4pm onwards at the Mahkota Ballroom, Hotel Istana Kuala Lumpur...
    2014-08-29 17:38
  • MMC Iftar 2014

    As per annual tradition, MMC held its MMC Iftar 2014 at Mahkota II & III Ballrooms, Hotel Istana Kuala Lumpur. The event which lasted from 6:00 pm onwards on 9 July 2014, was also joined by the...
    2014-07-21 11:46
  • CEO Info Session 2014

    We had just successfully commemorate our CEO Info Session 2014 which was held on the 22nd May 2014(Thursday) at level 23 Menara Tokyo Marine. The event started at 2.00PM and ended at 5.00 PM.
    2014-05-26 17:36

Our services


Last Updated: Friday, October 17, 2014 - 17:11

Detailed Design & Engineering Services For Baram South Development project

The project was awarded by Petronas Carigali Sdn Bhd (PCSB)in July 2003 for the Detailed Design services of three (3) platforms which is located approximately 25 km offshore Lutong, Sarawak.It comprises Compression & Production Platform (BAKP-B), Wellhead Platform (BAJT-H) and Wellhead Platform (BAJT-I), as well as the associated Pipelines tie-ins to the existing BAK-B and BAP-B platforms.

Period: 7/2003 - 10/2004
Total Manhours: 90,000
Weight: BAJT-H & BAJT-I 2100 MT , BAKP-B 5900 MT

The project was awarded by Petronas Carigali Sdn Bhd (PCSB) to MMC Oil & Gas Engineering Sdn Bhd in July 2003 for the Detailed Design services of three (3) platforms which is located approximately 25 km offshore Lutong, Sarawak. It comprises Compression & Production Platform (BAKP-B), Wellhead Platform (BAJT-H) and Wellhead Platform (BAJT-I), as well as the associated Pipelines tie-ins to the existing BAK-B and BAP-B platforms. BAJT-I is linked to BAJT-H via 10" multiphase pipeline/6" gaslift pipeline. While, BAJT-H is linked to BAKP-B via another separate multiphase/ gaslift pipeline for processing facilities at BAKP-B. A temporary 16-man shelter is located at BAKP-B. Detailed Design was completed in May'04, with AFC drawings finalized in October'04.

Facilities Description

• Water Depth ranges from 12m to 61m
• New BAKP-B bridge-linked to existing BAK-B
• 6-legged structure for BAKP-B, 4-legged structure for BAJT-H & BAJT-I
• Designed to produce 160 MMscfd of export gas and 55 MMscfd lift gas
• Designed for 25,000 bpd crude oil production
• Designed to SIPROD mode of operation and catering to jackup & rigup conditions.
• Design Life to 25 years
• Platform is expected to be in operation by 4th Quarter 2005.