Thursday, September 29, 2016      Login     Contact Us
 

News & Events

  • MMCOG Corporate Office Aidil Fitri 2016

    Sempena Hari Raya Aidil Fitri 2016, di atas kerjasama sepakat staf-staf MMCOG Corporate Office telah mengadakan Majlis Keramaian dan Makan-Makan...
    2016-08-15 17:38
  • CEO Info Session 2016

    Successfully commemorated our CEO Info Session 2016 which was held on the 18th May 2016 (Wednesday) at level 23 Menara Tokyo Marine. The event started at 3.00PM and ended at 5.00 PM.
    2016-06-15 15:42
  • Majlis Tahlil & Doa Selamat 2016

    MMCOG telah menjayakan Majlis Bacaan Tahlil & Doa Selamat sempena menyambut Ramadhan pada 1 Jun 2016, bersamaan 24 Shaaban 1437H.
    2016-06-07 13:09
  • Birthday Celebration for Staffs (Q1)

    MMCOG held its' quarterly birthday celebration and gathering for its employees for the first quarter of 2016.
    2016-04-07 17:57
  • OTC Asia 2016

    The inaugural Offshore Technology Conference (OTC) 2016, organised by 13 sponsoring societies, brings industry professionals to Asia's oil and gas hub to meet, share knowledge, and discover cutting-edge technologies. OTC Asia is a must-attend event, offering a peer-selected technical programme which focuses on the full spectrum of offshore technology in drilling, exploration, production, and environmental protection.
    2016-04-07 17:23

Our services

Last Updated: Friday, September 23, 2016 - 11:38


Detailed Design & Engineering Services For Baram South Development project

The project was awarded by Petronas Carigali Sdn Bhd (PCSB)in July 2003 for the Detailed Design services of three (3) platforms which is located approximately 25 km offshore Lutong, Sarawak.It comprises Compression & Production Platform (BAKP-B), Wellhead Platform (BAJT-H) and Wellhead Platform (BAJT-I), as well as the associated Pipelines tie-ins to the existing BAK-B and BAP-B platforms.

Period: 7/2003 - 10/2004
Total Manhours: 90,000
Weight: BAJT-H & BAJT-I 2100 MT , BAKP-B 5900 MT

The project was awarded by Petronas Carigali Sdn Bhd (PCSB) to MMC Oil & Gas Engineering Sdn Bhd in July 2003 for the Detailed Design services of three (3) platforms which is located approximately 25 km offshore Lutong, Sarawak. It comprises Compression & Production Platform (BAKP-B), Wellhead Platform (BAJT-H) and Wellhead Platform (BAJT-I), as well as the associated Pipelines tie-ins to the existing BAK-B and BAP-B platforms. BAJT-I is linked to BAJT-H via 10" multiphase pipeline/6" gaslift pipeline. While, BAJT-H is linked to BAKP-B via another separate multiphase/ gaslift pipeline for processing facilities at BAKP-B. A temporary 16-man shelter is located at BAKP-B. Detailed Design was completed in May'04, with AFC drawings finalized in October'04.

Facilities Description

• Water Depth ranges from 12m to 61m
• New BAKP-B bridge-linked to existing BAK-B
• 6-legged structure for BAKP-B, 4-legged structure for BAJT-H & BAJT-I
• Designed to produce 160 MMscfd of export gas and 55 MMscfd lift gas
• Designed for 25,000 bpd crude oil production
• Designed to SIPROD mode of operation and catering to jackup & rigup conditions.
• Design Life to 25 years
• Platform is expected to be in operation by 4th Quarter 2005.