Thursday, March 23, 2017      Login     Contact Us
 

News & Events

  • MLNG Jewel Run 2017

    A hearty congratulations to all finishers at the recently concluded The MLNG Jewel Run 2017 was held on 21st January 2017 at University Putra Malaysia Bintulu Campus.
    2017-02-27 15:36
  • CEO Info Session 2017

    successfully commemorate our Ceo Info Session 2017, which was held on 8 February 2017, Wednesday at level 1 Menara Tokyo Marine. The event started at 4.00 pm and ended at 5.30 pm.
    2017-02-15 13:18
  • Tahlil & Doa Selamat untuk Tahun 2017

    MMCOG telah menjayakan Majlis Bacaan Tahlil & Doa Selamat sempena kesyukuran, dan kedatangan tahun 2017 pada 5 Januari 2017, pada waktu Zohor di surau aras 19...
    2017-01-09 16:17
  • Blood Donation Campaign 2016

    In accordance to World Blood Donor Day in June, MMCOG also held a Blood Donation Campaign in September to support the notion...
    2016-10-28 16:28
  • MOGSEC 2016

    The 3rd Malaysia Oil & Gas Services Exhibition & Conference was a huge success. Throughout MOGSEC 2016, MMCOG along with other companies and Oil Giant PETRONAS have given overwhelming support...
    2016-10-05 16:52

Our services

Last Updated: Monday, March 6, 2017 - 09:42


Detailed Engineering Design Services of Sump and Drain Modification for Sarawak operation (SKO) Pipeline Replacement and Facilities Rejuvenation

The SKO Pipeline Rejuvenation project involves major pipeline asset replacements and upgrades to existing pipeline facilities to enable proper mitigation/monitoring for internal corrosion arising predominantly from Microbial Influenced Corrosion (MIC) with the objective of safeguarding short term and long term oil and gas production as well as reduce the risk of pipeline failure to ALARP.

 

Baram Fields Pipeline network

SKO currently operates a total of 172 pipelines with estimated total length of 1477 Km. Most of the SKO pipelines are offshore pipelines except for the terminal pipelines with onshore sections.

Integral to the work scope, the key actions identified to reduce the Pipeline Asset Risk to ALARP are detailed in the table below:

Client

:Petronas Carigali Sdn Bhd
Project Location:Malaysia
Project Duration:7 Months (Completed on Apr 2015)
Project No.:PCSB-A-2347U