Malaysian Refining Corporation Sdn Bhd (MRCSB) the owner of refining complex PSR-2 in Mukim Sungai Udang, Tangga Batu,Melaka intends to construct Two (2)additional of floating roof crude tanks. MMCOG and Warga Hikmat have formed a consortium to undertake the EPCC of the tanks. Other works include installation of new piping system and fire fighting facility such as foam system, water spray system and fire detection system. When completed by end of 2008, each tank will be capable of storing 500,000 barrels of crude oil as feedstock to PSR2.
| Client | : | MALAYSIAN REFINING COMPANY SDN BHD |
| Project Location | : | Petronas Penapisan Melaka Sdn Bhd, Sg. Udang, Melaka |
| Scope of work undertaken by MMC O&G | : | Engineering and Procurement |
| Project Duration | : | Approximately 26 months |
| Weight | : | N/A |