Saturday, November 01, 2014      Login     Contact Us
 

News & Events

  • MMC O&G targets to double revenue by 2018

    MMCOG as appeared on The Malaysian Reserve local business coverage in conjunction with MOGSEC 2014 event. Excerpted: "...MMC Oil & Gas Engineering to plan strategic mergers and acquisitions to add revenue and diversify business segments in the mix."
    2014-10-01 11:17
  • MOGSEC 2014

    MMCOG at the MOGSEC 2014 - a showcase of the latest technology, equipment and machinery in the fields of Oil, Gas and Petrochemical Engineering by Malaysian Oil & Gas service providers.
    2014-09-30 17:57
  • MMC Aidil Fitri Open House 2014

    As per annual tradition, MMCOG had also been invited to enliven the MMC Group Hari Raya Open House which was held on the 7th of August 2014 (11 Syawal 1435H) from 4pm onwards at the Mahkota Ballroom, Hotel Istana Kuala Lumpur...
    2014-08-29 17:38
  • MMC Iftar 2014

    As per annual tradition, MMC held its MMC Iftar 2014 at Mahkota II & III Ballrooms, Hotel Istana Kuala Lumpur. The event which lasted from 6:00 pm onwards on 9 July 2014, was also joined by the...
    2014-07-21 11:46
  • CEO Info Session 2014

    We had just successfully commemorate our CEO Info Session 2014 which was held on the 22nd May 2014(Thursday) at level 23 Menara Tokyo Marine. The event started at 2.00PM and ended at 5.00 PM.
    2014-05-26 17:36

Our services


Last Updated: Friday, October 17, 2014 - 17:11

EPCC Of Export Pipeline (Segment 1) Melut Basin Oil Development Project, Republic Of Sudan

MMC is involved in this project as part of the MMC-SINOPEC-TOCO (MST) consortium to provide EPCC services of the Melut Basin Oil Development Project (Segment B1).

Period: 6/2004 - 6/2005
Total Manhours: 30,000
Weight: 478 km/ 32

MMC is involved in this project as part of the MMC-SINOPEC-TOCO (MST) consortium to provide EPCC services of the Melut Basin Oil Development Project (Segment B1). This project taps the oil reserves of the Melut Basin Block 3 & 7, which will then be transported and processed to the Central Processing Facility (CPF), and later exported to a new Marine Terminal at Port Sudan. Overall pipeline distance is approx 1128km.1400km. The MST consortium is involved in Export Pipeline Segment B1, between PS4 & PS6, covering a distance of approx 480km. MMC is the Consortium leader , with MMC O&G scope's involving the Engineering & Procurement of this EPCC scope, whilst providing construction support.

• Project awarded in June 2004
• Pipeline Design pressure of 100 barg
• Design flowrate of 500,000 bblds
• Pipeline Max/Min design temp (80 deg C / -5 deg C)
• Design life of 25 years
• Crude properties are termed as waxy (prone to gelling)
• Engineering & Soil survey in parallel with design activities
• AC mitigation for pipeline paralleling HT transmission lines
• Estimated completion in June 2005 for Engineering and Procurement, while First Oil is expected to be in August 2005

Welding Commencement Ceremony
Pipe Welding