Wednesday, August 15, 2018      Login     Contact Us
 

News & Events

  • CEO Info Session & Raya 2018

    For 2018, in conjunction with celebrating Aidil Fitri, MMCOG aims to stabilize our presence, reinforcing present values while venturing into new opportunities with interested partners both locally and internationally...
    2018-08-13 18:09
  • MMCOG at MGA-MOGSC Industry Gala Dinner 2017

    This year the Malaysian Gas Association (MGA) & The Malaysian Oil & Gas Services Council (MOGSC) Industry Gala Dinner was held at the Grand Mahkota Ballroom of Istana Hotel Kuala Lumpur. The theme was A'la P. Ramlee and Saloma...
    2017-11-14 17:26
  • CEO TOWNHALL SESSION 2017

    The recent CEO Townhall Session for the year 2017 witnessed its first engagement between MMC Oil & Gas (MMCOG) staff with its newly appointed Chief Executive Officer, En. Rashid Bin Muhamad...............
    2017-08-24 11:06
  • MMCOG AT OIL & GAS ASIA (OGA) 2017

    The 16th Asian Oil, & Petrochemical Engineering Exhibition.
    2017-08-07 10:17
  • Hjh. Sharifah Zaida Nurlisha – Winner TOP 50 Female Energy Player In Emerging Economies (ASIA)

    Hjh. Sharifah Zaida Nurlisha is the General Manager of projects in MMC Oil & Gas Engineering Sdn. Bhd. and also the first elected female President of the Malaysian Oil and Gas Services Council (MOGSC).
    2017-06-13 10:14

Our services

Last Updated: Monday, August 13, 2018 - 18:12


Feed For Resalat (R1) Offshore Complex Renovation And Reconstruction Project

MMC Oil & Gas Engineering has pursued potential market in Iran and collaborated with Pegasus Oil & Gas Engineering to undertake the engineering and project management services which includes Front End Engineering Design (FEED) study for the Design of new topsides and substructure for Resalat (R1) Offshore Complex.

Period:
12/2003 - 6/2004
Weight: 30,000 MT

MMC Oil & Gas Engineering, having the relevant experience and track record in the Malaysian oil & gas market for the last 20 years, has pursued potential market in Iran and collaborated with Pegasus Oil & Gas Engineering to undertake the engineering and project management services which includes Front End Engineering Design (FEED) study for the Design of new topsides and substructure for Resalat (R1) Offshore Complex. The Resalat (R1) complex is located in the Persian Gulf, 80km south of Lavan Island, Iran in water depth of about 65 m.

The field has infrastructure facilities including process plants, storage and export system, utility and maintenance facilities, storehouse and loading jetty for support of offshore fields as well as the residential and social areas.

Facilities Description

• The existing Resalat (R1) Complex consists of Drilling Platform, Production Platform, Service Platform and a Flare Tripod.
• Feed studies will be performed to design facilities for the production of 80,000 stock barrels per day of total liquids in two trains of 40,000 SBFPD (total liquids) each and a test separator with a capacity of 10,000 barrel of liquids per day.
• In addition to these production facilities, a water injection system shall be designed to inject 40,000 BPD of seawater after adequate treatment.
• The new design for the Resalat complex will consists of the new drilling platform topside, new service platform topside, new Living Quarters topside, a new six-legged Production platform with new bridge linked to flare boom and 3 new satellite wellhead platforms.
• The study was completed in 6 months.
• Completed with 55,000 manhours.