MMC Oil & Gas Engineering Sdn Bhd was awarded the contract to provide the Front End Engineering Design Services for Petronas Carigali Sdn Bhd (CARIGALI). PC4 field is located approximately 148km offshore Bintulu at a water depth of 79 meters in block SK310. The first gas is expected in Quarter four of the year 2007.
| Client | : | PETRONAS CARIGALI SDN BHD (CARIGALI) / MMHE |
| Project Location | : | Approximately 148km Offshore Bintulu |
| Scope of work undertaken by MMC O&G | : | Front End Design for 2 Single completion wells, Inter-platform Pipeline (about 25km pipeline of size 12” to B11) and Host Tie-in at B11. |
| Project Duration | : | Approximately 6 Months |
| Weight | : | N/A |