Project Scope: DD to IFC
Complete and detailed review of facilities to confirm and finalize the facilities scope of work. Modification expected:
- Re-aero/replace aero bundle and potential upgrade of auxiliaries i.e. dry gas seals and coupling
- Replace 4 nos of anti surge valves
- Upgrade gas facilities processing systems i.e install inlet device for production separator and slug receiver and upgrade glycol dehydration (replace stripping column on glycol regeneration skid)
- Condensate pumps gear box change out
- Rearrange instruments to cater for restaged condition
- Replace internal parts of the fire case PSV
| Client | : | EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC |
| Project Location | : | Lawit-A Complex is located 240km NE of Kerteh |
| Project Duration | : | N/A |
| Weight | : | N/A |
| Technical Description | : | - Lawit-A is a CPP to Bintang A/B satellite platforms
- Reservoir pressure initially sufficient to free flow gas to shore
- 2 compressor trains installed in 1999
- Allows delivery up to design capacity of 700MCFD at 5,275kPa (765 psi) system pressure
- Current system pressure is at 3,200 kPa (464 psi); Lowest system pressure with the existing compressor is 3,000 kPa (435 psi), limited by the aero-bundle design
- New compressor bundle design is required for further system pressure reduction 1,500kpa (218 psi) to maximize gas production and recovery
- Lawit-A compressor restage committed start-up date of 1 st Quarter 2010
|