Saturday, November 29, 2014      Login     Contact Us
 

News & Events

  • MMC Games 2014

    MMC Oil & Gas Engineering, alongside our sister companies - were the competitors at our first infra-organizational MMC Games tournament 2014.
    2014-11-20 17:30
  • Recruitment Activity at Universiti Teknologi Malaysia

    MMCOG collaborates with Universiti Teknologi Malaysia (UTM) as one of the exhibitors at their career fair 14th & 15th October 2014.
    2014-11-13 17:43
  • MMCOG & OTM at NOVEL

    On the 23rd and 24th of September 2014, PETRONAS organized their first ever Novel Conference held at the Grand Hyatt, Kuala Lumpur.
    2014-11-06 14:43
  • MMC O&G targets to double revenue by 2018

    MMCOG as appeared on The Malaysian Reserve local business coverage in conjunction with MOGSEC 2014 event. Excerpted: "...MMC Oil & Gas Engineering to plan strategic mergers and acquisitions to add revenue and diversify business segments in the mix."
    2014-10-01 11:17
  • MOGSEC 2014

    MMCOG at the MOGSEC 2014 - a showcase of the latest technology, equipment and machinery in the fields of Oil, Gas and Petrochemical Engineering by Malaysian Oil & Gas service providers.
    2014-09-30 17:57

Our services


Last Updated: Thursday, November 20, 2014 - 17:31

Provision of Consultancy Services for Detailed Feasibility Study (DFS) and Front End Engineering Design (FEED) for 4th Dryer Bed Project at MLNG DUA Plant, Bintulu, Sarawak

The Petronas LNG complex at Bintulu, Sarawak, occupies an area of over 276 hectares and produces up to 23 MTPA of LNG.

The LNG plant is located in Bintulu, in the Malaysian state of Sarawak. It consists of 8 LNG trains of which three belong to MLNG Satu (the first joint venture), three to MLNG DUA and two to MLNG 3.
 
All three projects are located on one site; all use liquefaction technology developed by Air Products & Chemicals Int. (APCI) and share common facilities.
 
The LNG plant acquires its natural gas from 125 kilometres (80 mi) to 225 kilometres (140 mi) offshore of Bintulu from its partners Petronas Carigali and Royal Dutch Shell.

For this project, MMC Oil & Gas Engineering Sdn Bhd is to undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu, Sarawak

Client : Malaysia LNG Sdn Bhd (MLNG)
Project Location : MLNG Dua Plant, Bintulu, Sarawak
Project Duration : 4 months
Scope of Work : To undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu.
Total Man Hour : Lump Sum
Weight : N/A
Technical Description :
Description of Project.
  • Post MLNG DUA Debottlenecking (MDD) Capacity Realisation Taskforce was formed to consolidate, verify and scope out the items that limits MLNG DUA into realizing and sustaining its design capacity.
  • The original design life of MLNG DUA Dehydration Unit and the design life has been streamlined with overall modular equipments Certificate of Fitness (CoF).
  • Based on actual operations, the overall performance of the Dryer Beds has deteriorated faster than prediction and in turn has significantly impacted sustainable LNG production.
  • With all short term and medium term mitigation actions in place, the current design of MLNG DUA Dryer Beds (3 beds) are able to cater to a limited capacity only.
  • With the addition of a 4th dryer bed, MLNG DUA Dehydration Unit capacity is anticipated to be restored to design operating life.
  • 4th dryer bed proposal also supports the efforts to increase operating life of MLNG DUA modules to maximize through-put.