Thursday, April 24, 2014      Login     Contact Us
 

News & Events

  • Management Committee Meeting (MCM) Lunch & Farewell Ceremony

    Management Committee Meeting (MCM) had its fourth gathering and meeting on the 16th April 2014. In conjunction with the ceremonial lunch, it is also an event to warmly send-off...
    2014-04-18 17:40
  • MMC O&G bidding for RM700m contracts

    MMCOG as appeared on multiple presses' business coverage in conjunction with OTC 2014 event. Excerpted: MMC Corp Bhd's unit MMC Oil and Gas (O&G) Engineering Sdn Bhd is bidding for contracts worth RM 700 million domestically and abroad to grow its revenue by 200 percent to RM300 million a year from 2018.
    2014-04-01 17:55
  • OTC Asia 2014

    The inaugural Offshore Technology Conference (OTC) 2014, organised by 13 sponsoring societies, brings industry professionals to Asia's oil and gas hub to meet, share knowledge, and discover cutting-edge technologies. OTC Asia is a must-attend event, offering a peer-selected technical programme which focuses on the full spectrum of offshore technology in drilling, exploration, production, and environmental protection.
    2014-04-01 11:59
  • MMC Group 2014: CEO Awards for year 2013

    Ir. Noorul Khairi Mohd Nor, Chief Executive Officer of MMC Oil and Gas Engineering Sdn Bhd was named as MMC Group CEO of the Year 2013
    2014-03-21 11:52
  • MMC Group Senior Management Retreat

    The MMC Group Senior Management Retreat 2014 was organized on 28 February to 1 March at Thistle Hotel, Port Dickson.
    2014-03-21 11:09

Our services


Last Updated: Friday, April 18, 2014 - 17:40

Provision of Consultancy Services for Detailed Feasibility Study (DFS) and Front End Engineering Design (FEED) for 4th Dryer Bed Project at MLNG DUA Plant, Bintulu, Sarawak

The Petronas LNG complex at Bintulu, Sarawak, occupies an area of over 276 hectares and produces up to 23 MTPA of LNG.

The LNG plant is located in Bintulu, in the Malaysian state of Sarawak. It consists of 8 LNG trains of which three belong to MLNG Satu (the first joint venture), three to MLNG DUA and two to MLNG 3.
 
All three projects are located on one site; all use liquefaction technology developed by Air Products & Chemicals Int. (APCI) and share common facilities.
 
The LNG plant acquires its natural gas from 125 kilometres (80 mi) to 225 kilometres (140 mi) offshore of Bintulu from its partners Petronas Carigali and Royal Dutch Shell.

For this project, MMC Oil & Gas Engineering Sdn Bhd is to undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu, Sarawak

Client : Malaysia LNG Sdn Bhd (MLNG)
Project Location : MLNG Dua Plant, Bintulu, Sarawak
Project Duration : 4 months
Scope of Work : To undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu.
Total Man Hour : Lump Sum
Weight : N/A
Technical Description :
Description of Project.
  • Post MLNG DUA Debottlenecking (MDD) Capacity Realisation Taskforce was formed to consolidate, verify and scope out the items that limits MLNG DUA into realizing and sustaining its design capacity.
  • The original design life of MLNG DUA Dehydration Unit and the design life has been streamlined with overall modular equipments Certificate of Fitness (CoF).
  • Based on actual operations, the overall performance of the Dryer Beds has deteriorated faster than prediction and in turn has significantly impacted sustainable LNG production.
  • With all short term and medium term mitigation actions in place, the current design of MLNG DUA Dryer Beds (3 beds) are able to cater to a limited capacity only.
  • With the addition of a 4th dryer bed, MLNG DUA Dehydration Unit capacity is anticipated to be restored to design operating life.
  • 4th dryer bed proposal also supports the efforts to increase operating life of MLNG DUA modules to maximize through-put.