Monday, May 25, 2015      Login     Contact Us
 

News & Events

  • MMCOG Bowling Tournament 2015

    Our annual bowling tournament was held on the 18th April 2015 with up to 120 players joining the event. The winners are Kiwi (group), Serindit (women high series) and Cenderawasih (men high series).
    2015-05-08 10:27
  • CEO Info Session 2015

    We had just successfully commemorate our CEO Info Session 2015 which was held on the 17th April 2015(Friday) at level 23 Menara Tokyo Marine. The event started at 2.30PM and ended at 5.00 PM.
    2015-05-08 09:55
  • Arbitration Talk by Wong & Partners

    Wong & Partners held a talk at MMCOG detailing on the use of arbitration for the energy, mining & infrastructure industry.
    2015-05-08 09:38
  • MMCOG received Bentley's "Be Inspired" finalists' award

    On behalf of MMC Oil & Gas Engineering Sdn Bhd, our director, Ir. Mohamad cordially received the “Be Inspired" certificate award from Bentley's CEO Greg Bentley...
    2015-03-20 17:47
  • BDO Official Contract Signing Ceremony

    On the 10th of February 2015, MMCOG and MLNG officially signed for the opening of MMCOG's first Bintulu Design Office.
    2015-02-26 15:44

Our services


Last Updated: Thursday, May 21, 2015 - 11:10

Provision of Consultancy Services for Detailed Feasibility Study (DFS) and Front End Engineering Design (FEED) for 4th Dryer Bed Project at MLNG DUA Plant, Bintulu, Sarawak

The Petronas LNG complex at Bintulu, Sarawak, occupies an area of over 276 hectares and produces up to 23 MTPA of LNG.

The LNG plant is located in Bintulu, in the Malaysian state of Sarawak. It consists of 8 LNG trains of which three belong to MLNG Satu (the first joint venture), three to MLNG DUA and two to MLNG 3.
 
All three projects are located on one site; all use liquefaction technology developed by Air Products & Chemicals Int. (APCI) and share common facilities.
 
The LNG plant acquires its natural gas from 125 kilometres (80 mi) to 225 kilometres (140 mi) offshore of Bintulu from its partners Petronas Carigali and Royal Dutch Shell.

For this project, MMC Oil & Gas Engineering Sdn Bhd is to undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu, Sarawak

Client : Malaysia LNG Sdn Bhd (MLNG)
Project Location : MLNG Dua Plant, Bintulu, Sarawak
Project Duration : 4 months
Scope of Work : To undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu.
Total Man Hour : Lump Sum
Weight : N/A
Technical Description :
Description of Project.
  • Post MLNG DUA Debottlenecking (MDD) Capacity Realisation Taskforce was formed to consolidate, verify and scope out the items that limits MLNG DUA into realizing and sustaining its design capacity.
  • The original design life of MLNG DUA Dehydration Unit and the design life has been streamlined with overall modular equipments Certificate of Fitness (CoF).
  • Based on actual operations, the overall performance of the Dryer Beds has deteriorated faster than prediction and in turn has significantly impacted sustainable LNG production.
  • With all short term and medium term mitigation actions in place, the current design of MLNG DUA Dryer Beds (3 beds) are able to cater to a limited capacity only.
  • With the addition of a 4th dryer bed, MLNG DUA Dehydration Unit capacity is anticipated to be restored to design operating life.
  • 4th dryer bed proposal also supports the efforts to increase operating life of MLNG DUA modules to maximize through-put.