Wednesday, October 01, 2014      Login     Contact Us
 

News & Events

  • MOGSEC 2014

    MMCOG at the MOGSEC 2014 - a showcase of the latest technology, equipment and machinery in the fields of Oil, Gas and Petrochemical Engineering by Malaysian Oil & Gas service providers.
    2014-09-30 17:57
  • MMC Aidil Fitri Open House 2014

    As per annual tradition, MMCOG had also been invited to enliven the MMC Group Hari Raya Open House which was held on the 7th of August 2014 (11 Syawal 1435H) from 4pm onwards at the Mahkota Ballroom, Hotel Istana Kuala Lumpur...
    2014-08-29 17:38
  • MMC Iftar 2014

    As per annual tradition, MMC held its MMC Iftar 2014 at Mahkota II & III Ballrooms, Hotel Istana Kuala Lumpur. The event which lasted from 6:00 pm onwards on 9 July 2014, was also joined by the...
    2014-07-21 11:46
  • CEO Info Session 2014

    We had just successfully commemorate our CEO Info Session 2014 which was held on the 22nd May 2014(Thursday) at level 23 Menara Tokyo Marine. The event started at 2.00PM and ended at 5.00 PM.
    2014-05-26 17:36
  • Management Committee Meeting (MCM) Lunch & Farewell Ceremony

    Management Committee Meeting (MCM) had its fourth gathering and meeting on the 16th April 2014. In conjunction with the ceremonial lunch, it is also an event to warmly send-off...
    2014-04-18 17:40

Our services


Last Updated: Tuesday, September 30, 2014 - 18:00

Provision of Consultancy Services for Detailed Feasibility Study (DFS) and Front End Engineering Design (FEED) for 4th Dryer Bed Project at MLNG DUA Plant, Bintulu, Sarawak

The Petronas LNG complex at Bintulu, Sarawak, occupies an area of over 276 hectares and produces up to 23 MTPA of LNG.

The LNG plant is located in Bintulu, in the Malaysian state of Sarawak. It consists of 8 LNG trains of which three belong to MLNG Satu (the first joint venture), three to MLNG DUA and two to MLNG 3.
 
All three projects are located on one site; all use liquefaction technology developed by Air Products & Chemicals Int. (APCI) and share common facilities.
 
The LNG plant acquires its natural gas from 125 kilometres (80 mi) to 225 kilometres (140 mi) offshore of Bintulu from its partners Petronas Carigali and Royal Dutch Shell.

For this project, MMC Oil & Gas Engineering Sdn Bhd is to undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu, Sarawak

Client : Malaysia LNG Sdn Bhd (MLNG)
Project Location : MLNG Dua Plant, Bintulu, Sarawak
Project Duration : 4 months
Scope of Work : To undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu.
Total Man Hour : Lump Sum
Weight : N/A
Technical Description :
Description of Project.
  • Post MLNG DUA Debottlenecking (MDD) Capacity Realisation Taskforce was formed to consolidate, verify and scope out the items that limits MLNG DUA into realizing and sustaining its design capacity.
  • The original design life of MLNG DUA Dehydration Unit and the design life has been streamlined with overall modular equipments Certificate of Fitness (CoF).
  • Based on actual operations, the overall performance of the Dryer Beds has deteriorated faster than prediction and in turn has significantly impacted sustainable LNG production.
  • With all short term and medium term mitigation actions in place, the current design of MLNG DUA Dryer Beds (3 beds) are able to cater to a limited capacity only.
  • With the addition of a 4th dryer bed, MLNG DUA Dehydration Unit capacity is anticipated to be restored to design operating life.
  • 4th dryer bed proposal also supports the efforts to increase operating life of MLNG DUA modules to maximize through-put.