Saturday, December 20, 2014      Login     Contact Us
 

News & Events

  • Health Talk: "Silent Killers"

    In conjunction with the government's awareness raising campaign on "Silent Killers", MMCOG has held a Health Forum with Ms Priscilla Peter from Advanced Healthscreen Management
    2014-12-18 17:50
  • Majlis Bacaan Yassin & Doa Selamat Sempena Tahun Baru 2015

    MMCOG telah menjayakan Majlis Bacaan Yassin beserta Doa Selamat sempena menyambut kedatangan tahun 2015 pada 11 Disember 2014, bersamaan 18 Safar 1435H.
    2014-12-15 15:26
  • MMCOG's MINDA project appears as one of three finalists for Be Inspired Awards

    MMC Oil & Gas Engineering Sdn Bhd (MMCOG) was selected as one of three finalists for the MINDA project in the Project Performance category for the Be Inspired Awards competition.
    2014-12-15 10:06
  • MMCOG won 2 awards at the MSC SSO Night of Excellence

    MSC held their Shared Services & Outsourcing Night of Excellence Award 2014 on the 10th of December 2014. More than dozens of companies' representatives were invited as commemorative of their MSC statuses.
    2014-12-11 10:54
  • MMC Games 2014

    MMC Oil & Gas Engineering, alongside our sister companies - were the competitors at our first infra-organizational MMC Games tournament 2014.
    2014-11-20 17:30

Our services


Last Updated: Friday, December 19, 2014 - 17:34

Provision of Consultancy Services for Detailed Feasibility Study (DFS) and Front End Engineering Design (FEED) for 4th Dryer Bed Project at MLNG DUA Plant, Bintulu, Sarawak

The Petronas LNG complex at Bintulu, Sarawak, occupies an area of over 276 hectares and produces up to 23 MTPA of LNG.

The LNG plant is located in Bintulu, in the Malaysian state of Sarawak. It consists of 8 LNG trains of which three belong to MLNG Satu (the first joint venture), three to MLNG DUA and two to MLNG 3.
 
All three projects are located on one site; all use liquefaction technology developed by Air Products & Chemicals Int. (APCI) and share common facilities.
 
The LNG plant acquires its natural gas from 125 kilometres (80 mi) to 225 kilometres (140 mi) offshore of Bintulu from its partners Petronas Carigali and Royal Dutch Shell.

For this project, MMC Oil & Gas Engineering Sdn Bhd is to undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu, Sarawak

Client : Malaysia LNG Sdn Bhd (MLNG)
Project Location : MLNG Dua Plant, Bintulu, Sarawak
Project Duration : 4 months
Scope of Work : To undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu.
Total Man Hour : Lump Sum
Weight : N/A
Technical Description :
Description of Project.
  • Post MLNG DUA Debottlenecking (MDD) Capacity Realisation Taskforce was formed to consolidate, verify and scope out the items that limits MLNG DUA into realizing and sustaining its design capacity.
  • The original design life of MLNG DUA Dehydration Unit and the design life has been streamlined with overall modular equipments Certificate of Fitness (CoF).
  • Based on actual operations, the overall performance of the Dryer Beds has deteriorated faster than prediction and in turn has significantly impacted sustainable LNG production.
  • With all short term and medium term mitigation actions in place, the current design of MLNG DUA Dryer Beds (3 beds) are able to cater to a limited capacity only.
  • With the addition of a 4th dryer bed, MLNG DUA Dehydration Unit capacity is anticipated to be restored to design operating life.
  • 4th dryer bed proposal also supports the efforts to increase operating life of MLNG DUA modules to maximize through-put.