Friday, June 23, 2017      Login     Contact Us
 

News & Events

  • Hjh. Sharifah Zaida Nurlisha – Winner TOP 50 Female Energy Player In Emerging Economies (ASIA)

    Hjh. Sharifah Zaida Nurlisha is the General Manager of projects in MMC Oil & Gas Engineering Sdn. Bhd. and also the first elected female President of the Malaysian Oil and Gas Services Council (MOGSC).
    2017-06-13 10:14
  • Majlis Kesyukuran & Bacaan Yassin 2017

    Jemputan Majlis Kesyukuran dan Bacaan Yassin
    2017-05-22 14:54
  • Birthday Celebration for Staffs

    As per our proud tradition for our employees, MMCOG held its' quarterly birthday celebration and gathering for its employees for the first quarter of 2017.
    2017-05-05 10:42
  • MLNG Jewel Run 2017

    A hearty congratulations to all finishers at the recently concluded The MLNG Jewel Run 2017 was held on 21st January 2017 at University Putra Malaysia Bintulu Campus.
    2017-02-27 15:36
  • CEO Info Session 2017

    successfully commemorate our Ceo Info Session 2017, which was held on 8 February 2017, Wednesday at level 1 Menara Tokyo Marine. The event started at 4.00 pm and ended at 5.30 pm.
    2017-02-15 13:18

Our services

Last Updated: Thursday, June 22, 2017 - 12:40


Provision of Consultancy Services for Detailed Feasibility Study (DFS) and Front End Engineering Design (FEED) for 4th Dryer Bed Project at MLNG DUA Plant, Bintulu, Sarawak

The Petronas LNG complex at Bintulu, Sarawak, occupies an area of over 276 hectares and produces up to 23 MTPA of LNG.

The LNG plant is located in Bintulu, in the Malaysian state of Sarawak. It consists of 8 LNG trains of which three belong to MLNG Satu (the first joint venture), three to MLNG DUA and two to MLNG 3.
 
All three projects are located on one site; all use liquefaction technology developed by Air Products & Chemicals Int. (APCI) and share common facilities.
 
The LNG plant acquires its natural gas from 125 kilometres (80 mi) to 225 kilometres (140 mi) offshore of Bintulu from its partners Petronas Carigali and Royal Dutch Shell.

For this project, MMC Oil & Gas Engineering Sdn Bhd is to undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu, Sarawak

Client : Malaysia LNG Sdn Bhd (MLNG)
Project Location : MLNG Dua Plant, Bintulu, Sarawak
Project Duration : 4 months
Scope of Work : To undertake preparation of Detail Feasibility Study and Front End Engineering Design (FEED) for the MLNG Dua Dehydration Unit, New 4th Dryer Bed at Tanjung Kidurung, Bintulu.
Total Man Hour : Lump Sum
Weight : N/A
Technical Description :
Description of Project.
  • Post MLNG DUA Debottlenecking (MDD) Capacity Realisation Taskforce was formed to consolidate, verify and scope out the items that limits MLNG DUA into realizing and sustaining its design capacity.
  • The original design life of MLNG DUA Dehydration Unit and the design life has been streamlined with overall modular equipments Certificate of Fitness (CoF).
  • Based on actual operations, the overall performance of the Dryer Beds has deteriorated faster than prediction and in turn has significantly impacted sustainable LNG production.
  • With all short term and medium term mitigation actions in place, the current design of MLNG DUA Dryer Beds (3 beds) are able to cater to a limited capacity only.
  • With the addition of a 4th dryer bed, MLNG DUA Dehydration Unit capacity is anticipated to be restored to design operating life.
  • 4th dryer bed proposal also supports the efforts to increase operating life of MLNG DUA modules to maximize through-put.