Friday, June 23, 2017      Login     Contact Us
 

News & Events

  • Hjh. Sharifah Zaida Nurlisha – Winner TOP 50 Female Energy Player In Emerging Economies (ASIA)

    Hjh. Sharifah Zaida Nurlisha is the General Manager of projects in MMC Oil & Gas Engineering Sdn. Bhd. and also the first elected female President of the Malaysian Oil and Gas Services Council (MOGSC).
    2017-06-13 10:14
  • Majlis Kesyukuran & Bacaan Yassin 2017

    Jemputan Majlis Kesyukuran dan Bacaan Yassin
    2017-05-22 14:54
  • Birthday Celebration for Staffs

    As per our proud tradition for our employees, MMCOG held its' quarterly birthday celebration and gathering for its employees for the first quarter of 2017.
    2017-05-05 10:42
  • MLNG Jewel Run 2017

    A hearty congratulations to all finishers at the recently concluded The MLNG Jewel Run 2017 was held on 21st January 2017 at University Putra Malaysia Bintulu Campus.
    2017-02-27 15:36
  • CEO Info Session 2017

    successfully commemorate our Ceo Info Session 2017, which was held on 8 February 2017, Wednesday at level 1 Menara Tokyo Marine. The event started at 4.00 pm and ended at 5.30 pm.
    2017-02-15 13:18

Our services

Last Updated: Thursday, June 22, 2017 - 12:40


RUBY-A (RBDP-A) Gaslift Project

MMC Oil & Gas Engineering Sdn Bhd was awarded the contract to provide engineering support by PTSC (Vietnam) as part of the latter’s fabrication work of Ruby-B (RBDP-B) Topsides for Petronas Carigali Vietnam (PCV).

Period: 1/2004 - 6/2005
Total Manhours: Ruby A : 14,000 Ruby B:15,000
Weight:

RUBY-A (RBDP-A) Gaslift Project

Ruby field is located approximately 155km offshore Vung Tau, SR Vietnam in Blocks 01 and 02, in water depth of about 50m. Pilot phase production from Ruby field commenced on 22 October 1998 with the field facility consisting of a wellhead platform RBDP-A, a Floating, Processing, Storage and Offloading vessel (FPSO Ruby Princess) and a 100 subsea pipeline which transports the unstabilised crude from the platform RBDP-A to the FPSO Ruby Princess. Ruby Drilling Platform A (RBDP-A) Gaslift Project presents the basis for the design and installation of a mini gaslift compressor and associated facilities and tie in work at the host platform RBDP-A and FPSO, RUBY PRINCESS.

PROVISION OF POST AFC ENGINEERING DESIGN FOR RUBY-B (RBDP-B) TOPSIDES FABRICATION
MMC Oil & Gas Engineering Sdn Bhd was awarded the contract to provide engineering support by PTSC (Vietnam) as part of the latter’s fabrication work of Ruby-B (RBDP-B) Topsides for Petronas Carigali Vietnam (PCV). Included in the scope of work is the completion of detailed engineering previously prepared to be completed to an Approved for Construction (AFC) status and to verify and conduct design checks. Also included in the scope of work is vendor data review and vendor data incorporation of major equipment and piping items and to provide response and technical advice to technical queries. MMC Oil & Gas Engineering Sdn Bhd provided and set up a site team at RBDP-B project office in Vung Tau, Vietnam.

Facilities Description

• Provide response and technical advice on site queries.
• Provide continuous supervision and coordination which include design activities, supervision of the project team and planning of work scope to achieve the required technical standard and satisfactory project completion within budget and schedule.
• Provide inter discipline checks for integration and clashes.
• Weight control and weight report to determine actual weight and final center of gravity location.
• Review vendor data, interface with Vendor and provide vendor data incorporation for compliance with overall process requirements for the platform.
• Review and update engineering documents and drawings.
• Provide review, comments and updating on the AFC packages.