Main contractor: Malaysia Marine and Heavy Engineering Holdings Berhad (MHB)

The Bokor Field is located within the Baram Delta in the South China Sea, about 45km North West of Lutong, Miri, Sarawak. Equity in the field is shared between PCSB and SSB, with PCSB as Operator. See Figure 1-2 below.

MMCOG was awarded with the project in 2017 to undertake the Detailed Design Engineering, Procurement Support, Construction Support & Final as built for the Central Processing Plant (CPP).

                       Bokor Field Location

CPP is an 8-legged structure bridge-linked to the existing BOK-A platform. The main facilities on the CPP include:

  • Gas/liquid separation (120 kbpd gross liquids)
  • Produced water treatment (80 kbpd)
  • Gas lift/export compression (90 MMscfd)
  • Gas injection compression (20 MMscfd)
  • Gas dehydration for injection gas
  • Seawater treatment and injection pumping (60 kbpd)

 

  • Client Petronas Carigali Sdn Bhd (PCSB)
  • Project Location Miri, Sarawak
  • Project Duration 3 years (2017-2020)
  • Project No. MHB-A-2599