Friday, June 23, 2017      Login     Contact Us
 

News & Events

  • Hjh. Sharifah Zaida Nurlisha – Winner TOP 50 Female Energy Player In Emerging Economies (ASIA)

    Hjh. Sharifah Zaida Nurlisha is the General Manager of projects in MMC Oil & Gas Engineering Sdn. Bhd. and also the first elected female President of the Malaysian Oil and Gas Services Council (MOGSC).
    2017-06-13 10:14
  • Majlis Kesyukuran & Bacaan Yassin 2017

    Jemputan Majlis Kesyukuran dan Bacaan Yassin
    2017-05-22 14:54
  • Birthday Celebration for Staffs

    As per our proud tradition for our employees, MMCOG held its' quarterly birthday celebration and gathering for its employees for the first quarter of 2017.
    2017-05-05 10:42
  • MLNG Jewel Run 2017

    A hearty congratulations to all finishers at the recently concluded The MLNG Jewel Run 2017 was held on 21st January 2017 at University Putra Malaysia Bintulu Campus.
    2017-02-27 15:36
  • CEO Info Session 2017

    successfully commemorate our Ceo Info Session 2017, which was held on 8 February 2017, Wednesday at level 1 Menara Tokyo Marine. The event started at 4.00 pm and ended at 5.30 pm.
    2017-02-15 13:18

Our services

Last Updated: Thursday, June 22, 2017 - 12:40


Provision of FEED and EPCIC of Kasawari Gas Development Project

MMCOG worked with Saipem Sapura Kencana for the Kasawari Gas Development Project entailing the main objectives of WHP ready for Rig (RFR ) as well as First Gas Date (FGD) within 15 to 33 months from effective date.

The Kasawari gas field was discovered in November 2011 within a water depth of approximately
108m at the center.

The Kasawari Field is located in Block SK316 within the Central Luconia Province (See Figure 1 below),
approximately 200km North of Bintulu, Sarawak - Malaysia. The Kasawari gas field was discovered
in November 2011 within a water depth of approximately 108m at the center.

Figure 1 Location of Kasawari Field

 

Figure 2 Overall Kasawari Gas Development Project

As shown in the figure 2 above, MMCOG's role was to provide engineering design for the facilities of Kasawari which include:

  • Central Processing platform (CPP) – 8-legged
  • 9-slot Wellhead platform (WHP) – 4-legged
  • Flare structures – tripod
  • Bridges (CPP to WHP and CPP to Flare structure)

Client

:Saipem & Sapura Kencana
Project Location:Malaysia
Project Duration:8 Months (project completion on Jan 2015)